Kohler K-2804-P5-96 Installation Guide Page 6

  • Download
  • Add to my manuals
  • Print
  • Page
    / 24
  • Table of contents
  • BOOKMARKS
  • Rated. / 5. Based on customer reviews
Page view 5
6
1007278-2-A
Kohler Co., Kohler, WI, U.S.A.
Cut out the opening by carefully following the pencil line.
CAUTION: Risk of personal injury or product
damage. Large lavatories are very heavy. Get help
lifting the lavatory into place.
Temporarily position the lavatory in the countertop cutout
so the “Kohler” logo is visible. The logo is on the
underside, near the drain.
Remove the lavatory from the countertop cutout.
Fig. #15
Drill the faucet holes.
Install the faucet to the countertop according to the
manufacturers instructions.
Install the drain to the lavatory according to the drain
installation instructions.
Apply a bead of sealant around the countertop cut-out
hole. Apply the sealant approximately 1/4” (6mm) away
from the cut-out hole edge.
CAUTION: Risk of personal injury or product
damage. Large lavatories are very heavy. Get help
lifting the lavatory into place.
Note the location of the “Kohler” logo. The lavatory should
be installed so the logo is visible after installation.
Carefully position the lavatory in the countertop cutout.
Use care to avoid smearing the sealant bead. Wipe away
any excess sealant with a clean cloth.
Allow the sealant to cure for at least 30 minutes before
proceeding.
Fig. #16
Cutout Hole
Bead of Sealant
1/4”
(6mm)
Connect the faucet supply lines.
Connect the drain assembly.
Open the faucet valves, and check for leakage.
Clean up with a non-abrasive cleaner.
Fig. #17
Nut
Gasket
Nut
Gasket
Page view 5
1 2 3 4 5 6 7 8 9 10 11 ... 23 24

Comments to this Manuals

No comments