Kohler K-101-PB Installation Guide Page 15

  • Download
  • Add to my manuals
  • Print
  • Page
    / 52
  • Table of contents
  • BOOKMARKS
  • Rated. / 5. Based on customer reviews
Page view 14
12. Six Prong Handle Installation
Verify that the valves are in the closed position.
NOTICE: Risk of product damage. Do not overtighten.
Overtightening will damage the handle.
Insert the stem screw into the stem extension and tighten with a
screwdriver.
Loosen the setscrew.
Position the handle assembly on the stem extension.
Verify that the handle label is in an even horizontal position. If
needed, remove the handle and adjust its position on the splines
of the stem extension until horizontal. For fine adjustment, pull
out the stem extension until it disengages from the valve, rotate,
and return it to its original position. Do not pull the stem
extension completely out.
Tighten the setscrew.
Repeat for the other handle.
Open
Close
Open
Close
Six Prong
Handle
Stem
Extension
Stem
Screw
Setscrew
Bonnet
Shown in Closed Position
Kohler Co. 15 1008209-2-G
Page view 14
1 2 ... 10 11 12 13 14 15 16 17 18 19 20 ... 51 52

Comments to this Manuals

No comments