Kohler K-101-PB Installation Guide Page 6

  • Download
  • Add to my manuals
  • Print
  • Page
    / 52
  • Table of contents
  • BOOKMARKS
  • Rated. / 5. Based on customer reviews
Page view 5
3. Deck-Mount Supply Installation
Remove the temporary plugs from the water supply couplings.
Construct a frame for the deck with two 1 (2.5 cm) holes
measuring 8 (20.3 cm) apart from the center of each hole.
Carefully slide the plated supply pipe through the holes.
Thread the supply pipe into the supply rough-in and tighten with
a strap wrench.
Securely strap the supply pipes to the framing below the bath
deck.
Loosen the setscrew in the flange.
Carefully slide the flange down the supply pipe so it rests on the
bath deck.
Tighten the flange setscrew.
8" (20.3 cm) Center-to-Center
1" (2.5 cm) Diameter Holes
Plated
Supply
Pipe
Setscrew
Flange
1008209-2-G 6 Kohler Co.
Page view 5
1 2 3 4 5 6 7 8 9 10 11 ... 51 52

Comments to this Manuals

No comments