Kohler K-T10278-4A-G Installation Guide Page 11

  • Download
  • Add to my manuals
  • Print
  • Page
    / 48
  • Table of contents
  • BOOKMARKS
  • Rated. / 5. Based on customer reviews
Page view 10
5. Check Operation of Valves
Thread a 3/8” pipe plug into the top of the spout supply tube.
Ensure that the valves are closed (cold fully counterclockwise; hot
fully clockwise).
Turn on the main water supply and check the complete installation
for leaks with the valves closed and open. Repair leaks as needed.
Close both valves and turn off the main water supply.
WARNING: Risk of personal injury.
Wrap a towel around the pipe plug to prevent water spray. Water
will purge from the supply tube when you remove the plug.
Carefully loosen the pipe plug to remove pressure.
Thread the pipe plug back into the spout supply tube. Leave the
pipe plug installed until the spout and handles are installed.
Install the cardboard plaster guards over both valves and the spout
supply tube. Leave in place until the spout and handles are
installed.
3/8" Pipe Plug
CLOSE
HOT
CLOSE
COLD
Kohler Co. 11 1017937-2-A
Page view 10
1 2 ... 6 7 8 9 10 11 12 13 14 15 16 ... 47 48

Comments to this Manuals

No comments