3. Secure the Bath
For All Installations
Install the drain to the bath according to the drain manufacturer’s instructions. Do not connect the
trap at this time.
Using a clean drop cloth or similar material, cover the bottom of the bath and the airjets. This will
protect the bath surface and components from being scratched or damaged during the installation
process.
Secure Bath to the Subfloor
CAUTION: Risk of product damage. Do not lift the bath by the piping or blower motor, or use the
piping or blower motor for structural support of the bath.
CAUTION: Risk of product damage. Do not support the bath by the rim.
NOTICE: The bath must be secured using one of the following three methods: cement or mortar bed,
construction adhesive, or silicone sealant. Choose the installation option that best applies to your
particular installation. Follow the appropriate instructions.
NOTICE: Ensure the subfloor is level before proceeding. If necessary, use shims to achieve level.
Cement or Mortar Bed Method
NOTICE: Do not use gypsum cement or drywall compound, as these materials will not provide a durable
bond. Only use cement or mortar.
Spread a 2 (5.1 cm) thick later of cement or mortar on the subfloor except where the leveling blocks
will be located.
Clear any cement or mortar away from the leveling block locations.
Place a plastic liner or similar material over the cement or mortar.
With help, carefully move the bath into the installation area. Make sure the blower motor control
and leveling blocks do not rest in the bed material.
Verify the leveling blocks are resting directly on the subfloor. Reposition as needed.
Verify the bath is level across the top of the bath. If the bath is not level, shims must be used under
the leveling blocks.
Connect the drain tailpiece to the trap.
Remove the protective tape from the rim.
Apply a continuous bead of high-quality silicone sealant around the entire rim of the bath. Allow
the sealant to cure according to the manufacturer’s instructions.
Clear spaces
for leveling
blocks.
Apply a bead of
silicone sealant
around the entire
rim.
OR
Apply construction
adhesive to the
leveling blocks.
Spread a 2" (5.1 cm)
layer of cement or
mortar bed material.
1035472-2-H 8 Kohler Co.