Install the Piping (cont.)
Install copper tubing from the in-line water filter (if applicable) to the inlet on the steam
generator(s).
Connect the pressure relief valve to a drain line. The drain line should meet all applicable codes.
Before connecting the water inlet line, flush the water line into a large pail to remove any silt or
other materials that may be in the line.
Make the final connection of the water supply to the steam generator. Check for leaks.
NOTE: All Kohler steam generators are equipped with an automatic water fill system. The water will stop
after the unit is full.
Turn on the water to fill the unit.
If the steam outlet piping run exceeds 10 ft (3 m) or is exposed to cold areas, insulate the piping
with steam rated insulation.